【本页摘要 Summary】
- 在澳洲维州,业主和建筑商的住宅建筑纠纷,一般要先自己书面沟通,再申请建筑和管道委员会(BPC)的免费纠纷解决服务,之后才能到 VCAT。
In Victoria, Australia, domestic building disputes between owners and builders generally go first to written negotiation, then to the free Building and Plumbing Commission (BPC) dispute service, before VCAT. - 住宅建筑合同的订金有上限:合同价低于 $20,000 最多 10%,$20,000 或以上最多 5%;进度款按完成的工程阶段付。
Deposits are capped: 10% for contracts under $20,000 and 5% for $20,000 or more; progress payments follow completed stages. - 2026 年 7 月 1 日起签的合同,超过 $20,000 的合资格住宅工程由 Home Warranty 保障,每套住宅最高 $400,000。
For contracts signed from 1 July 2026, eligible domestic work over $20,000 is covered by Home Warranty, up to $400,000 per home. - 分包商、供应商追讨工程款可用维州《建筑业付款保障法》(SOP Act):对方收到付款请求后 10 个工作日内不回复付款明细表,一般要付全额。
Subcontractors and suppliers can use the Victorian SOP Act: if no payment schedule is given within 10 business days, the full claim is generally payable. - SOP Act 2026 年 4 月 15 日起有重大修改:付款请求期限延长到实际完工后 6 个月,并新增履约保证金(保留金)释放请求。
Major SOP Act amendments took effect on 15 April 2026: claims can be made up to 6 months after practical completion, and performance securities can now be claimed.
作者:HWC Legal 法律团队
最后更新:2026-11
在澳洲盖房、装修或做工程,纠纷往往不是输在道理上,而是输在没留证据、错过期限——每一张变更单和每一封邮件,都可能决定结果。
In Australian building disputes, people rarely lose on the merits — they lose on missing paperwork and missed deadlines. Every variation and every email can decide the outcome.
📑 目录 Contents
🏗️ 你的澳洲建筑纠纷属于哪一类?Which Type of Building Dispute Do You Have?
在澳洲维州,建筑纠纷先要分清楚是哪一类,因为适用的法律和程序完全不同。
In Victoria, Australia, the first step is to identify the type of dispute, because the law and the process are completely different.
业主请建筑商盖房、加建或装修,一般属于住宅建筑合同,受《1995 年住宅建筑合同法》(Domestic Building Contracts Act 1995)管辖。
A homeowner engaging a builder to build, extend or renovate usually has a domestic building contract under the Domestic Building Contracts Act 1995.
分包商、供应商向总包追讨工程款,或商业项目之间的付款纠纷,通常可以用《2002 年建筑业付款保障法》(SOP Act)。
Subcontractors and suppliers claiming payment from a head contractor, and payment disputes on commercial projects, can usually use the Building and Construction Industry Security of Payment Act 2002 (SOP Act).
三类常见纠纷对比 Three common types
| 纠纷类型 Type | 主要法律 Main law | 一般去哪里 Where to go |
|---|---|---|
| 业主 vs 建筑商(住宅) Owner vs builder (domestic) | Domestic Building Contracts Act 1995 | 先 BPC 免费纠纷解决,再 VCAT BPC dispute resolution, then VCAT |
| 分包商/供应商追讨工程款 Subcontractor / supplier payment | SOP Act 2002 | 付款请求 → 裁决(Adjudication)→ 法院执行 Payment claim → adjudication → court enforcement |
| 只请了单一工种(如油漆)的小型修缮 Single-trade repairs | 澳洲消费者法 Australian Consumer Law | 可能不属于 BPC 受理范围,需个案评估 May not be eligible for BPC; case-by-case |
注意:业主和建筑商之间的住宅建筑合同不适用 SOP Act;但总包和分包商之间的合同适用。
Note: the SOP Act does not cover domestic building contracts between a builder and a homeowner, but it does cover contracts between the builder and its subcontractors.
🏠 业主和建筑商的纠纷:维州处理流程 Owner–Builder Disputes in Victoria
维州消费者事务局(Consumer Affairs Victoria)建议按步骤处理,不要一开始就停付全部款项或换建筑商。
Consumer Affairs Victoria recommends a step-by-step approach — don’t stop all payments or replace the builder on day one.
第一步:当面沟通并保留证据 Step 1: Talk and keep records
先和建筑商讨论问题,保留合同、发票、书面往来,记录每次通话,并给有问题的工程拍照。
Discuss the issue with your builder, keep the contract, invoices and written messages, note every conversation and photograph the work in question.
第二步:正式书面通知 Step 2: Put it in writing
谈不拢就发信或电邮正式列出问题、要求答复;邮寄的话用挂号信。
If talking fails, send a formal letter or email setting out the issues and asking for a response; use registered post if posting.
书面记录可以证明你已经合理尝试自行解决,这是之后申请 BPC 服务的前提。
A written record shows you made a reasonable attempt to resolve the dispute — a precondition for the BPC service.
第三步:申请 BPC 免费纠纷解决 Step 3: BPC dispute resolution
建筑和管道委员会(Building and Plumbing Commission,BPC)为合资格的住宅建筑纠纷提供免费、中立的纠纷解决服务,以前叫 DBDRV。
The Building and Plumbing Commission (BPC) provides a free, impartial dispute resolution service for eligible domestic building disputes — formerly known as DBDRV.
纠纷解决官员会组织调解(conciliation);涉及健康、安全或经济困难的申请可能优先处理。
Dispute Resolution Officers facilitate conciliation; applications involving health, safety or financial hardship may be prioritised.
调解不成,BPC 可以发出有约束力的纠纷解决令(dispute resolution order),或发证书让案件进入 VCAT。
If conciliation fails, BPC may issue a binding dispute resolution order or a certificate allowing the matter to proceed to VCAT.
第四步:VCAT 或法院 Step 4: VCAT or court
拿到 BPC 证书后,可以向维州民事和行政仲裁庭(VCAT)申请;金额、证据和专家报告的准备会直接影响结果,需个案评估。
With a BPC certificate you can apply to VCAT; the amount, evidence and expert reports all affect the outcome and need case-by-case assessment.
💡 业主还可以向 Justice Connect 的住宅建筑法律服务(Domestic Building Legal Service,DBLS)寻求免费信息和法律帮助。
💡 Victorian homeowners can also seek information and legal help from the Domestic Building Legal Service (DBLS) run by Justice Connect.
💰 订金、进度款和变更(Variation)规则 Deposits, Progress Payments and Variations
维州法律直接规定了住宅建筑合同的订金上限和分阶段付款比例,很多纠纷其实源于多付或提前付款。
Victorian law sets deposit caps and stage payments for domestic building contracts; many disputes start with overpaying or paying in advance.
订金上限 Deposit caps
| 合同价 Contract price | 订金上限 Maximum deposit |
|---|---|
| 低于 $20,000 Under $20,000 | 10% |
| $20,000 或以上 $20,000 or more | 5% |
在建筑商给你物业的保险证明(certificate of currency)之前,不要付订金。
Don’t pay the deposit until the builder gives you a certificate of currency for your property.
全阶段合同的常见进度款 Usual stage payments (all stages)
| 阶段 Stage | 比例 % of price |
|---|---|
| 基础 Base | 10% |
| 框架 Frame | 15% |
| 封顶 Lock-up | 35% |
| 装修固定 Fixing | 25% |
只做到封顶或装修固定阶段的合同,比例不同;想约定其他付款方式,应先取得法律意见。
Lock-up-only or fixing-only contracts use different percentages; get legal advice before agreeing to anything else.
变更(Variation)要书面同意 Variations must be agreed in writing
变更须由业主和建筑商书面同意,并写明新价格和完工日期,才能施工。
Variations must be agreed in writing, including the new price and completion date, before the work is done.
如果建筑商合理认为变更不需改许可、不会延误、增加不超过原合同价 2%,可以不出变更通知。
A variation notice is not required if the builder reasonably believes the change needs no permit change, causes no delay and adds no more than 2% to the price.
建筑测量师下令的变更,业主不同意的,要在收到通知后 5 个工作日内书面告知建筑商。
If you disagree with a variation ordered by the building surveyor, tell the builder in writing within 5 business days of the notice.
建筑商本应根据地基资料预见的问题(例如岩石),一般不应向业主额外收费。
You generally should not pay extra for problems the builder should have foreseen from the foundation data, such as rock.
🛡️ 质量缺陷、法定保证和 Home Warranty Defects, Statutory Warranties and Home Warranty
维州所有住宅建筑工程都有法定建筑保证(statutory building warranties),规定了工艺和材料的标准。
All domestic building work in Victoria carries statutory building warranties that set the standard of workmanship and materials.
按维州消费者事务局说明,这些保证在占用许可或最终检查证书签发后最长 10 年内有效,房子转卖后也继续适用。
According to Consumer Affairs Victoria, these warranties apply for up to 10 years after the occupancy permit or certificate of final inspection, even if the property is sold.
Home Warranty:2026 年 7 月 1 日起的新保险 Home Warranty from 1 July 2026
📅 适用合同 Which contracts
2026 年 7 月 1 日或之后签订、价值超过 $20,000 的合资格住宅建筑工程。
Eligible domestic building work over $20,000 under contracts signed on or after 1 July 2026.
💵 保障金额 How much
每套住宅合计最高 $400,000,视资格、限额和除外条款而定。
Up to $400,000 in total per home, subject to eligibility, limits and exclusions.
⏳ 保障期 How long
重大缺陷最长 6 年,其他缺陷或不合规工程最长 2 年(从完工起)。
Major defects up to 6 years; other defects or non-compliant work up to 2 years after completion.
Home Warranty 取代了新合同的旧住宅建筑保险(DBI);7 月 1 日前已有的 DBI 保单按原条款继续。
Home Warranty replaces Domestic Building Insurance (DBI) for new contracts; existing DBI policies continue on their current terms.
注册建筑商须在签约后 10 个工作日内或开工前(以较早者为准)缴付保费;用了未注册建筑商做须注册的工程,就没有这项保障。
The registered builder must pay the premium within 10 business days of signing or before work starts, whichever is earlier; using an unregistered builder for registrable work leaves you unprotected.
签约前先查建筑商注册,签约后拿到保险通知(Notice of Cover)再付钱——这是业主最便宜的风险控制。
Check the builder’s registration before signing, and get the Notice of Cover before paying — the cheapest risk control an owner has.
📄 分包商追讨工程款:SOP Act(含 2026 新规)Recovering Payment Under the SOP Act
维州 SOP Act 让做了工程或供应材料、服务的一方,可以快速、低成本地追讨进度款,合同口头或书面都可以。
The Victorian SOP Act gives anyone who carries out construction work or supplies related goods and services a fast, low-cost way to recover progress payments, whether the contract is oral or written.
合同里「总包收到钱才付分包」(pay when paid / pay if paid)的条款没有效力。
“Pay when paid” and “pay if paid” clauses have no effect.
四个步骤 Four steps
- 付款请求 Payment claim:写明工程、金额,并注明依据 SOP Act 提出。
Specify the work and amount, and state it is made under the SOP Act. - 付款明细表 Payment schedule:对方有异议,须在收到请求后 10 个工作日内(或合同约定更早的时间)给出,否则一般要付全额。
A respondent who disputes the claim must serve a schedule within 10 business days (or earlier if the contract says so), or is generally liable for the full amount. - 裁决 Adjudication:通过授权提名机构(ANA)申请,裁决人一般在 10 个工作日内作出决定,双方同意可再延长最多 20 个工作日。
Apply through an Authorised Nominating Authority; the adjudicator generally decides within 10 business days, extendable by up to 20 business days by agreement. - 法院执行 Court enforcement:对方不付裁决金额,可以把裁决证书交到法院作为债务判决执行。
If the adjudicated amount is not paid, file the adjudication certificate in court for judgment as a debt.
2026 年 4 月 15 日起的主要修改 Key changes from 15 April 2026
| 项目 Item | 修改后 After 15 April 2026 |
|---|---|
| 何时可提请求 When to claim | 每月最后一天起(合同可约定更早),不再需要 reference date;每月最多一次 From the last day of each month; no reference dates; one claim per month |
| 最晚期限 Latest claim | 实际完工或全部供货后 6 个月(原 3 个月) 6 months after practical completion (was 3 months) |
| 付款期限上限 Payment terms cap | 收到请求后最多 20 个工作日;合同没写的默认 10 个工作日 Max 20 business days; default 10 business days |
| 保证金/保留金 Performance security | 可以依法请求释放;动用保证金前须先通知并至少等 5 个工作日 Release can be claimed; 5 business days’ notice before recourse |
| 裁决答复 Adjudication response | 不能提出付款明细表里没写的新理由 No new reasons beyond the payment schedule |
| 工作日 Business day | 不含 12 月 22 日至 1 月 10 日 Excludes 22 December to 10 January |
修改前已签的合同有过渡安排,具体适用哪个版本,需个案评估。
Transitional arrangements apply to earlier contracts; which version applies needs case-by-case assessment.
⏱️ 关键期限一览 Key Deadlines at a Glance
| 事项 Matter | 期限 Deadline |
|---|---|
| 回复 SOP 付款请求 Respond to an SOP payment claim | 10 个工作日内(或合同更早) 10 business days (or earlier per contract) |
| 收到裁决意向通知后补交付款明细表 Schedule after notice of intention to adjudicate | 5 个工作日 5 business days |
| 对测量师下令的变更提出异议 Object to a surveyor-ordered variation | 5 个工作日 5 business days |
| Home Warranty 保费缴付 Home Warranty premium | 签约后 10 个工作日内或开工前 Within 10 business days of signing or before work starts |
| 法定建筑保证 Statutory warranties | 占用许可/最终检查证书后最长 10 年 Up to 10 years from occupancy permit / final inspection |
| Home Warranty 重大缺陷 / 其他缺陷 Home Warranty major / other defects | 6 年 / 2 年 6 years / 2 years |
具体期限的起算点和例外很复杂,发现问题请尽早咨询,不要等到快过期。
Start dates and exceptions are complex — get advice early rather than close to a deadline.
🤝 我们能做什么 Our Building Dispute Services
- 签约前审阅住宅建筑合同、变更条款和付款安排,用中文逐条解释风险。
Reviewing domestic building contracts, variation clauses and payment terms before you sign, explained clause by clause in Mandarin. - 起草给建筑商的正式函件,整理证据,准备 BPC 纠纷解决申请。
Drafting formal letters to the builder, organising evidence and preparing BPC dispute applications. - 代表业主或建筑商处理 VCAT 建筑纠纷。
Acting for owners or builders in VCAT building disputes. - 为分包商、供应商准备 SOP 付款请求和裁决申请,或代表总包回复付款请求。
Preparing SOP payment claims and adjudication applications for subcontractors and suppliers, or responding for head contractors.
买新房或楼花的过户手续,可参考 墨尔本房产过户;工程公司的合同和生意问题,请看 墨尔本商业律师。
For buying a new home, see our Melbourne conveyancing page; for construction business contracts, see our Melbourne business lawyer page.
相关文章:维州建筑缺陷纠纷:BPC 和 VCAT、维州 SOP Act 工程款追讨指南。
Related reading: building defects disputes in Victoria (BPC and VCAT) and our Victorian SOP Act payment guide.
HWC Legal 由维多利亚州执业律师负责澳洲建筑纠纷和工程款追讨:合同审阅、证据整理、BPC 调解、VCAT 和 SOP 裁决。
HWC Legal’s Victorian lawyers handle building disputes and construction payment recovery in Australia: contract review, evidence, BPC conciliation, VCAT and SOP adjudication.
我们提供价格匹配:如您拿到其他机构的正式书面报价,同等服务范围下我们可以匹配。
Price match: bring us a formal written quote from another provider for the same scope of service, and we can match it.
免费 20 分钟电话咨询 Free 20-minute phone consultation
📞 0402 672 808 📧 info@hwclegal.com 💬 WeChat:wanwuim2021 🌐 hwclegal.com
❓ 常见问题 FAQ
在维州和建筑商有纠纷,可以直接去 VCAT 吗?
一般不可以。住宅建筑纠纷通常要先自己书面沟通,再申请建筑和管道委员会(BPC)的免费纠纷解决服务;调解不成,BPC 可以发出有约束力的纠纷解决令,或发证书让案件进入 VCAT。是否属于 BPC 受理范围(例如只请了单一工种的小工程)需个案评估。
盖房或装修的订金最多可以付多少?
按维州《1995 年住宅建筑合同法》,合同价低于 $20,000 的订金最多 10%,$20,000 或以上最多 5%。在建筑商给出物业的保险证明之前不要付订金,之后按完成的阶段付进度款,不要提前付。
房子交房后发现质量问题,还能找建筑商吗?
可以考虑。维州住宅建筑工程有法定建筑保证,按维州消费者事务局说明,最长在占用许可或最终检查证书签发后 10 年内有效,转卖后也适用。2026 年 7 月 1 日起签约的合资格工程还有 Home Warranty(重大缺陷最长 6 年、其他缺陷最长 2 年)。具体能否索赔需个案评估。
Home Warranty 和以前的住宅建筑保险(DBI)有什么不同?
Home Warranty 适用于 2026 年 7 月 1 日或之后签约、价值超过 $20,000 的合资格住宅建筑工程,每套住宅合计最高 $400,000,可能在工程未完成、有缺陷或不合规时提供帮助。7 月 1 日前已有的 DBI 保单按原条款继续,不会转到 Home Warranty。
分包商被总包拖欠工程款怎么办?
可以按维州 SOP Act 送达付款请求。对方有异议须在 10 个工作日内(或合同约定更早)给出付款明细表,否则一般要付全额;有争议可以申请裁决,裁决金额不付可以到法院执行。2026 年 4 月 15 日起,付款请求可以在实际完工后 6 个月内提出。
建筑商要加钱做变更(Variation),我必须同意吗?
变更一般须业主和建筑商书面同意,并写明新价格和完工日期才能施工。建筑商本应根据地基资料预见的问题,一般不应额外收费。测量师下令的变更你不同意的,要在收到通知后 5 个工作日内书面告知建筑商。
来源 Sources:Domestic Building Contracts Act 1995 (Vic);Building and Construction Industry Security of Payment Act 2002 (Vic)(经 Building Legislation Amendment (Fairer Payments on Jobsites and Other Matters) Act 2025 修改,2026 年 4 月 15 日生效);建筑和管道委员会(BPC)「Disputes about domestic building work」「Overview of SOP Act」「Changes to the SOP scheme」「Home Warranty」页面;维州消费者事务局「Building disputes, defects and delays」「Deposits and payments for building work」「Building problems after property settlement」页面(2026-11-23 查阅)。
免责声明:本页为一般法律信息,不构成法律意见。每份合同和每个案件情况不同,请在采取行动前咨询律师。
Disclaimer: This page is general information, not legal advice. Every contract and case is different — get advice before you act.